3/20/2025
HOUSING DEVELOPMENT NEWS - MARCH 2025
In building C, reinforced concrete walls for the second floor are currently being constructed, while in building B, the ceiling above the first floor is being constructed.
At the same time, earthworks for building A have begun, preceded by the demolition of the existing residential building located on the plot.